CRAWLER, TRUCK, AND WHEEL MOUNTED CRANES
|
||||||
|
Contract Name and Number:
|
Contractor/Subcontractor:
|
|||||
|
Government Inspector:
|
Location:
|
|||||
|
Contractor Inspector:
|
Date:
|
|||||
|
Equipment name and number:
|
||||||
|
PERFORMANCE LOAD TEST RESULTS
(Data and
results of performance test required by EM 385-1-1,
Sections
16.C.13, 16.D.06a, and Appendix H)
|
||||||
|
Date:
|
Weight of Performance Test:
|
Maximum anticipated load:
|
||||
|
Safe Working Load:
|
Length of Boom:
|
Maximum radius at which test was performed:
|
||||
|
|
Yes
|
No
|
N/A
|
|||
|
1.
Is the slow moving emblem used on all vehicles which by design move at
25 MPH or less on public roads?
(08.A.04)
|
|
|
|
|||
|
2.
Are seats or equal protection provided for each person required to
ride on the equipment? (16.A.07a)
|
|
|
|
|||
|
3.
Is equipment operating on streets and highways equipped with
headlights, tailights, brake lights, back light, and turn signals (visible
from front and rear)? (16.A.07b)
|
|
|
|
|||
|
4. Is all equipment equipped with operable
windshield wipers, and defrosting or defogging equipment? (16.A.07c)
|
|
|
|
|||
|
5.
Does the unit have an emergency brake which will automatically stop
the equipment upon brake failure? Is
this system manually operable from the driver’s position? (16.A.07d)
|
|
|
|
|||
|
6.
Is the area where the crane is to work level, firm and secured? (16.A.10)
|
|
|
|
|||
|
7.
Is there a record of manufacturer’s approval of any modification of
equipment which affects its capacity or safe operation? (16.A.18)
|
|
|
|
|||
|
8.
Is a dry chemical or carbon dioxide fire extinguisher rated at least
5-B: C on the crane? (16.A.26)
|
|
|
|
|||
|
9.
Is there an effective, working reverse alarm? (16.B.01)
|
|
|
|
|||
|
10.
Is there a signalperson or warning device when there is a danger to
persons from moving equipment, swinging loads, buckets, booms, etc.? (16.B.02)
|
|
|
|
|||
|
11.
Are all belts, gears, shafts, pulleys, sprockets, spindles, drums,
flywheels, chains, or other reciprocating, rotating, or moving parts
guarded? (16.B.03a)
|
|
|
|
|||
|
12.
Are fuel tanks located in a manner to prevent spills or overflows from
running onto engine exhaust or electrical equipment? (16.B.04)
|
|
|
|
|||
|
13. Are the
following with the crane at all times: manufacturer’s operating manual and a
manual for any crane operator aids; load rating chart; and the crane’s log
book documenting operating hours, maintenance, inspections and tests? (16.C.02)
|
|
|
|
|||
|
14. During crane
operation, does the operator have full view of the load and the load travel
path at all times or is a signal person used?
(16.C.03b)
|
|
|
|
|||
|
15. Is the crane
operator designated as qualified by a source that qualifies crane operators? (16.C.04c)
|
|
|
|
|||
|
16. Is the crane
operator qualified for each type of crane he/she is to operate? (16.C.05a(1))
|
|
|
|
|||
|
17. Does the
operator meet the physical qualifications listed in Appendix G? (16.C.05b)
|
|
|
|
|||
|
18.
Is there adequate clearance from overhead structures and electrical
sources for the crane to be operated safely? (16.C.09)
|
|
|
|
|||
|
|
Yes
|
No
|
N/A
|
|||
|
19. Is there an
adequate clearance maintained between moving and rotating structures of the
crane and fixed objects? Minimum clearance is 16 inches. (16.C.09b)
|
|
|
|
|||
|
20. Are there at
least three full wraps of cable on the drums of hoisting equipment at all
times? (16.C.10a)
|
|
|
|
|||
|
21. Is a
pre-operational checklist used for daily inspections? (16.C.12c)
|
|
|
|
|||
|
22. Is a written
report of the performance test maintained with the crane or on site? (16.C.13c)
|
|
|
|
|||
|
23. Is riding on
loads, hooks, hammers, buckets, material hoists, or other hoisting equipment
prohibited? (16.C.15)
|
|
|
|
|||
|
24. Where practical
are tag lines used to control loads?
(16.C.16)
|
|
|
|
|||
|
25. Before making a
critical lift, has a critical lift plan been prepared by a qualified person
and reviewed and signed by all personnel involved with the lift? (16.C.18)
|
|
|
|
|||
|
26.
Are lattice boom cranes equipped with a boom angle indicator and a
load indicating device, or a load moment indicator? (16.D.01)
|
|
|
|
|||
|
27.
Are lattice boom and hydraulic cranes equipped with a means for the
operator to visually determine levelness?
(16.D.02)
|
|
|
|
|||
|
28.
Are lattice boom and hydraulic mobile cranes (except articulating
booms cranes) equipped with drum rotation indicators? (16.D.03)
|
|
|
|
|||
|
29.
Are lattice boom and hydraulic mobile cranes equipped with a boom
angle or radius indicator within the operator’s view? (16.D.04)
|
|
|
|
|||
|
30.
Are lattice boom cranes, with exception of duty cycle cranes, equipped
with an anti-two blocking device?
(16.D.05)
|
|
|
|
|||
|
31.
Has the boom stop test on cable-supported booms been performed?
(16.D.06)
|
|
|
|
|||
|
32.
Do the boom stops which, at the angle specified by the crane
manufacturer, limit the movement of that portion of the boom below the point
at which the boom stops acts on the boom?
(16.D.06a)
|
|
|
|
|||
|
33.
Has the crane’s foundation been evaluated for stability? (16.D.07)
|
|
|
|
|||
|
34.
Before the start of boom assembly and disassembly has the manufacturer’s
assembly and disassembly procedures been reviewed by all members of the
assembly/disassembly team? (16.D.08a)
|
|
|
|
|||
|
35.
Are the outriggers fully extended?
(16.D.09)
|
|
|
|
|||
|
36.
Unless the manufacturer has specified an on-rubber rating, are the
outriggers fully extended and down?
(16.D.10)
|
|
|
|
|||
|
37.
Are truck and crawler cranes attached to a barge or pontoon by a slack
tie down system? (16.F.08)
|
|
|
|
|||
|
38.
Have load ratings been modified to reflect the increased loading from
list, trim, wave, and wind action?
(16.F.04c)
|
|
|
|
|||
|
39.
Are all deck surfaces above the water?
(16.F.05b(2))
|
|
|
|
|||
|
40.
Is the entire bottom area of the barge or pontoon submerged? (16.F.04b(3))
|
|
|
|
|||
|
41.
Are tie downs available and used?
(16.F.04b(4))
|
|
|
|
|||
|
42.
Are cranes blocked and secured?
(16.F.04b(5))
|
|
|
|
|||
|
Comments:
|
||||||
|
|
||||||